SKUAS installs and refills anti-termite reticulation systems for builders, architects, housing societies, hospitals, schools, hotels, factories and government projects. Every site gets TermiPore porous pipe and Envu Premise SC at the IS 6313 dose; what changes is scheduling, documentation and the plan that fits the building.
Pipe laid to your pour schedule, a flow-test log and handover documents for buyers.
Specification text, layout detailing and coordination with the structure.
Refills for builder-installed systems, AMC and protection for common areas.
Odourless chemical, records for audits and work planned around patient areas.
Installation and refills in holidays, protection for libraries and furniture.
Work kept out of guest areas, protection for wooden interiors and lawns.
Large slabs, racking and stored cartons protected with minimal downtime.
Tender-ready specifications and IS 6313 dosage records.
The pipe and chemical are the same on every site. A builder needs the pipe laid between excavation and the floor pour without holding up the schedule. A hospital needs odourless chemical and records for its audit file. A warehouse needs the slab protected before racking goes in. Each industry page explains how we plan the work for that kind of building.
We also work with religious buildings, farmhouses, data rooms, showrooms and heritage properties. Call or WhatsApp us and we will plan a system for your site.
Our engineer visits, measures the plinth and shares an itemised quote. The best time is before the plinth beam or floor PCC.