Anti-Termite Reticulation System in Faridabad

Quick answer

SKUAS provides anti-termite reticulation in Faridabad for sector houses, Greater Faridabad homes and industrial sheds. Before the floor PCC we lay TermiPore porous pipe along the outer plinth and inner walls, charge it with Envu Premise SC at the IS 6313 dose, and refill it every 2 to 3 years through junction boxes, with no drilling of finished floors.

TermiPore porous pipesEnvu Premise SC termiticideDosage as per IS 6313Written SKUAS warrantyServing since 2012

Faridabad's older HUDA sectors date back several decades, and many houses in Sectors 14, 15, 16, 17 and 21 are now due for rebuilding. Owners are replacing them with larger family homes or builder floors on the same plots. Across the Agra Canal, Greater Faridabad, often called Neharpar, has newer sectors roughly from 75 to 89 where group housing and plotted homes are still going up.

Faridabad is also one of Haryana's main industrial towns, with units spread across Sectors 24, 25, 27, 58 and 59 and along Mathura Road. Factories keep cartons, timber and packed goods at ground level, and a termite problem under a shed floor can stay hidden for a long time. Whether the site is a house or a factory, pipe laid at plinth level is the part of the treatment you can keep refilling for years.

Termite risk in Faridabad: what we plan for

Aravalli ridge on one side, Yamuna plain on the other

Western Faridabad around Surajkund and Badkhal sits on rocky, sandy Aravalli soil, while Greater Faridabad lies on the softer alluvial plain of the Yamuna. Termites forage deep in the dry ridge soil and spread widely through the damp plain. We adjust the bedding and pipe route to the ground we find on each site.

Old sector houses with wooden fittings

Houses built in the 1970s and 1980s in the older sectors often have solid wood door frames, wooden almirahs and wooden staircases. When such a house is demolished, buried wood and debris keep feeding termite colonies in the plot. We recommend clearing visible wood waste from the excavation before the pipe goes in.

Industrial floors and loading bays

Units in Sectors 24, 25 and 58 typically run large sheds with ground-bearing floors, loading bays and raw material on pallets. Once machines are installed, the soil under such a floor is very hard to reach. A pipe grid along columns and walls lets the maintenance team refill the barrier without moving any equipment.

Waterlogging after heavy rain

Low-lying parts of NIT and Greater Faridabad are known to collect water during heavy monsoon spells. Repeated soaking and drying of the soil around a plinth is one reason single soil treatments lose strength over the years. A refillable system lets us top up the barrier after a wet season instead of waiting for termites to appear indoors.

Reticulation pipe layout along boundary and internal walls with junction boxes, and a cross-section at the plinth
Typical layout we install in Faridabad: porous pipe along every wall line, refilled through junction boxes outside.

Pipe and chemical we use in Faridabad

TermiPore porous pipe cross-section showing micro-pores on all sides

The pipe we install

TermiPore porous pipe

Made in Vadodara, Gujarat, India from a thermoplastic elastomeric compound with a honeycomb micro-pore wall. Termiticide seeps out evenly through micro-pores on all sides, unlike hand-drilled PVC that leaks at a few holes. The manufacturer rates pipe life at 30 to 50 years (manufacturer estimate).

Sizes, specs and how to spot genuine pipe
Envu Premise SC termiticide 1 litre bottle

The chemical we charge it with

Envu Premise SC

Imidacloprid 30.5% SC from Envu (formerly Bayer Environmental Science). It is odourless and non-repellent: termites cannot detect it, carry it back to the nest and pass it on to the colony.

Why we use Premise SC

Reticulation plans in Faridabad

PipeGuard Basic

Boundary protection for compact homes

  • Coverage: External boundary (plinth perimeter) only
  • Pipe: TermiPore 17.5 mm (green stripe)
  • Refill points: Junction box every 25 to 30 m
  • Chemical: First charge with Envu Premise SC
  • Warranty: Up to 3 years written SKUAS warranty
  • Refill: Refill recommended every 2 years
  • Flow test before covering
  • Installation photos

Rate: shared after a free site inspection

Get my estimate

PipeGuard Max

Builders, societies and commercial sites

  • Coverage: Boundary, internal walls and under-floor grid
  • Pipe: TermiPore 19.5 mm premium (red stripe)
  • Refill points: Brass-nipple junction boxes every 20 m
  • Chemical: First charge with Envu Premise SC
  • Warranty: Up to 10 years written SKUAS warranty with AMC
  • Refill: Scheduled refills under AMC
  • Pressure and flow test log
  • As-built drawing for handover
  • Annual inspection report

Rate: shared after a free site inspection

Get my estimate

Every site is different. Soil, plinth size, wall layout and access change the final figure, so we confirm the exact rate after a free site inspection. Warranty is SKUAS's own written service warranty; the period depends on the plan and site conditions.

Free estimate in 30 seconds

Reticulation System Estimator

Get the pipe length, number of refill points, chemical quantity and the right plan for your building. Our engineer then shares the exact rate on WhatsApp or call.

Buildings we protect in Faridabad

Rebuilt houses in old HUDA sectors

Pipe around the new plinth and every room wall, with ports in the front lawn or car porch.

Greater Faridabad plots and societies

Plinth and basement wall lines for new homes and towers in the Neharpar sectors across the Agra Canal.

Factories in Sectors 24, 25, 58 and 59

Boundary, column-line and under-floor pipe for new production sheds, raw material stores and loading bays, laid before the floor is cast.

Farmhouses on the Surajkund side

Loops around the main house, staff quarters and wooden outbuildings on large plots near the ridge.

How a Faridabad installation runs

Faridabad is covered from our New Delhi head office on Okhla Road, which links directly to the city via Mathura Road and the Badarpur border. For factory sites we prefer a walk-through with the plant engineer before quoting, so pipe runs avoid machine foundations, drains and cable trenches. House rebuilds are scheduled around the contractor's plinth and filling dates.

  1. Free site visit. We measure the plinth and mark wall lines on your drawing.
  2. Pipe laying. TermiPore pipe on a levelled bed along every planned line, joined to junction boxes.
  3. Flow test. Water is pumped through each loop before the pipe is covered.
  4. First charge. Premise SC at the IS 6313 dose of 5 L per m² of floor area.
  5. Handover. Photos, port layout and your refill reminder schedule.

Chemical quantity per charge

Chemical quantity per charge (IS 6313 dose of 5 L per m² of floor area)
Floor areaDiluted emulsionPremise SC concentrate
500 sq ft≈ 230 litres≈ 490 ml
1,000 sq ft≈ 465 litres≈ 980 ml
1,500 sq ft≈ 695 litres≈ 1.5 litres
2,000 sq ft≈ 930 litres≈ 2.0 litres
3,000 sq ft≈ 1,395 litres≈ 2.9 litres
5,000 sq ft≈ 2,325 litres≈ 4.9 litres
10,000 sq ft≈ 4,645 litres≈ 9.8 litres

Areas we cover in and around Faridabad

Sector 7, Sector 9, Sector 10, Sector 11, Sector 14, Sector 15, Sector 16, Sector 17, Sector 21, Sector 21C, Sector 28, Sector 31, Sector 37, Sector 46, NIT Faridabad, Old Faridabad, Ballabgarh, Sainik Colony, Green Field Colony, Surajkund, Badkhal, Sector 24, Sector 25, Sector 58, Sector 59, Greater Faridabad, Sector 81, Sector 86, Sector 88.

Frequently asked questions: reticulation in Faridabad

After demolition and excavation, once the new plinth beam is cast. We lay pipe before the earth is filled and the floor PCC is poured. If the old house had termites, mention it at the first visit and we will check the excavation for leftover wood and debris.
Pipe cannot be added under existing machine floors. Those areas are treated with drill-fill-seal along walls and columns, and we lay pipe in trenches along the outer boundary. For a new shed or an extension, a full grid goes in before the floor is cast.
In a society the decision usually rests with the developer, because the pipe is laid during construction. If your project is still at the basement stage, raise it with the developer now. For a finished ground-floor flat, drill-fill-seal treatment is the practical option.
We normally use the standard green-stripe TermiPore pipe, and the heavier red-stripe pipe for high-load zones or PipeGuard Max. On rocky or gravelly ground we add a sand cushion so the pipe sits evenly and is not damaged when the fill is compacted.
Every 2 to 3 years, as TermiPore recommends. We keep your junction box layout on record and remind you when a refill is due. For a typical house the refill takes a few hours and nobody needs to enter the rooms.

Aam sawal (Hinglish)

Naya plinth beam banne ke baad, aur farsh ka PCC daalne se pehle.
Machine ke neeche nahi. Wahan drill-fill-seal hota hai, aur bahar boundary par pipe.
Har 2 se 3 saal me, junction box se, kamre khole bina.

Building in Faridabad? Book a free site inspection

Our engineer visits, measures the plinth and shares an itemised quote. The best time is before the plinth beam or floor PCC.