Anti-Termite Reticulation System in Greater Noida

Quick answer

For homes and buildings in Greater Noida, including YEIDA plots on the Yamuna Expressway, SKUAS lays TermiPore porous pipe around the plinth and inner walls before the floor PCC. The pipe is charged with Envu Premise SC at the IS 6313 dose and refilled every 2 to 3 years through junction boxes, so no drilling is needed later.

TermiPore porous pipesEnvu Premise SC termiticideDosage as per IS 6313Written SKUAS warrantyServing since 2012

Greater Noida was laid out on a larger scale than its neighbour. The Greek-letter sectors such as Alpha, Beta, Gamma and Delta have wide residential plots and many independent houses. Greater Noida West is a dense belt of high-rise societies, and Knowledge Park and the Techzone areas hold colleges, hostels and offices. Further south, YEIDA residential plots along the Yamuna Expressway are being built on as the area around the Noida International Airport at Jewar develops.

Many plot owners here build in stages. The foundation may be finished months before the walls go up, and the plinth often stands open through a monsoon. That gap is exactly when reticulation pipe should be laid. Once the ground floor is cast over farmland soil that already carries termite colonies, the chance to place a refillable barrier underneath is gone.

Termite risk in Greater Noida: what we plan for

Former farmland under new sectors

Large parts of Greater Noida and the YEIDA area were agricultural fields until recently. Crop residue, tree stumps and old field bunds support subterranean termite colonies that stay in the soil after the land is levelled. A new house on such a plot is often the first building those colonies have met.

Vacant plots on every side

In sectors where many allotted plots are still empty, a new house may have open land on two or three sides for years. Termites forage freely from that land. Pipe along the complete outer plinth, including any garage block or servant quarter, keeps a treated line between your building and the vacant plots.

Low-lying land and standing water

Parts of Greater Noida West lie close to the Hindon, and the southern sectors drain towards the Yamuna. After heavy rain, water can stand on low plots for days. We lay the pipe on a levelled bed and test the flow before it is covered, so a settling fill does not choke the line.

Construction paused between stages

Owners on YEIDA and Greek-letter sector plots often stop work between the foundation and the superstructure. We can lay and flow-test the pipe at the plinth stage and give the first chemical charge later, closer to the floor PCC, so the dose is not spent on soil that stays exposed to rain.

Reticulation pipe layout along boundary and internal walls with junction boxes, and a cross-section at the plinth
Typical layout we install in Greater Noida: porous pipe along every wall line, refilled through junction boxes outside.

Pipe and chemical we use in Greater Noida

TermiPore porous pipe cross-section showing micro-pores on all sides

The pipe we install

TermiPore porous pipe

Made in Vadodara, Gujarat, India from a thermoplastic elastomeric compound with a honeycomb micro-pore wall. Termiticide seeps out evenly through micro-pores on all sides, unlike hand-drilled PVC that leaks at a few holes. The manufacturer rates pipe life at 30 to 50 years (manufacturer estimate).

Sizes, specs and how to spot genuine pipe
Envu Premise SC termiticide 1 litre bottle

The chemical we charge it with

Envu Premise SC

Imidacloprid 30.5% SC from Envu (formerly Bayer Environmental Science). It is odourless and non-repellent: termites cannot detect it, carry it back to the nest and pass it on to the colony.

Why we use Premise SC

Reticulation plans in Greater Noida

PipeGuard Basic

Boundary protection for compact homes

  • Coverage: External boundary (plinth perimeter) only
  • Pipe: TermiPore 17.5 mm (green stripe)
  • Refill points: Junction box every 25 to 30 m
  • Chemical: First charge with Envu Premise SC
  • Warranty: Up to 3 years written SKUAS warranty
  • Refill: Refill recommended every 2 years
  • Flow test before covering
  • Installation photos

Rate: shared after a free site inspection

Get my estimate

PipeGuard Max

Builders, societies and commercial sites

  • Coverage: Boundary, internal walls and under-floor grid
  • Pipe: TermiPore 19.5 mm premium (red stripe)
  • Refill points: Brass-nipple junction boxes every 20 m
  • Chemical: First charge with Envu Premise SC
  • Warranty: Up to 10 years written SKUAS warranty with AMC
  • Refill: Scheduled refills under AMC
  • Pressure and flow test log
  • As-built drawing for handover
  • Annual inspection report

Rate: shared after a free site inspection

Get my estimate

Every site is different. Soil, plinth size, wall layout and access change the final figure, so we confirm the exact rate after a free site inspection. Warranty is SKUAS's own written service warranty; the period depends on the plan and site conditions.

Free estimate in 30 seconds

Reticulation System Estimator

Get the pipe length, number of refill points, chemical quantity and the right plan for your building. Our engineer then shares the exact rate on WhatsApp or call.

Buildings we protect in Greater Noida

Independent houses in Greek-letter sectors

Outer plinth plus room-wise loops for houses in Alpha, Beta, Gamma, Delta and similar sectors, with ports near the gate.

YEIDA residential plots

Plinth-stage pipe for new homes along the Yamuna Expressway, scheduled around staged construction and long breaks in work.

Greater Noida West societies

Basement perimeter and tower plinth lines coordinated with the developer, with junction boxes in common areas for refills.

Colleges, hostels and factories

Boundary and column-line pipe for Knowledge Park campuses and units in the Ecotech and Surajpur industrial areas.

How a Greater Noida installation runs

We serve Greater Noida from our New Delhi head office on Okhla Road. Because plots here are often built in phases, we stay in touch with the owner or contractor after the first visit and fix the pipe laying date only once the plinth beam is cast and filling is about to begin. For YEIDA plots further down the Expressway, we group nearby visits where we can.

  1. Free site visit. We measure the plinth and mark wall lines on your drawing.
  2. Pipe laying. TermiPore pipe on a levelled bed along every planned line, joined to junction boxes.
  3. Flow test. Water is pumped through each loop before the pipe is covered.
  4. First charge. Premise SC at the IS 6313 dose of 5 L per m² of floor area.
  5. Handover. Photos, port layout and your refill reminder schedule.

Chemical quantity per charge

Chemical quantity per charge (IS 6313 dose of 5 L per m² of floor area)
Floor areaDiluted emulsionPremise SC concentrate
500 sq ft≈ 230 litres≈ 490 ml
1,000 sq ft≈ 465 litres≈ 980 ml
1,500 sq ft≈ 695 litres≈ 1.5 litres
2,000 sq ft≈ 930 litres≈ 2.0 litres
3,000 sq ft≈ 1,395 litres≈ 2.9 litres
5,000 sq ft≈ 2,325 litres≈ 4.9 litres
10,000 sq ft≈ 4,645 litres≈ 9.8 litres

Areas we cover in and around Greater Noida

Alpha 1, Alpha 2, Beta 1, Beta 2, Gamma 1, Gamma 2, Delta 1, Delta 2, Delta 3, Chi, Phi, Mu, Omicron, Pi 1, Pi 2, Zeta, Eta, Swarn Nagri, Knowledge Park, Techzone 4, Greater Noida West, Bisrakh, Kasna, Surajpur, Ecotech 3, Pari Chowk, YEIDA Sector 18, YEIDA Sector 20, Jewar.

Frequently asked questions: reticulation in Greater Noida

Only at one stage. The pipe goes in after the plinth beam and before the earth filling and floor PCC. If you share your construction timeline when work begins, we will hold that window for you and visit before the foundation is complete to mark the layout.
Not for the pipe. We can lay it, flow-test it and cover it with the first layer of fill whenever your contractor is ready. The first chemical charge can then be given closer to the floor PCC, so the treated soil is not left open to rain for months.
Yes, mostly with developers and facility teams. For finished towers we lay pipe along accessible external edges and treat ground-floor units and common areas with drill-fill-seal. Junction boxes go in common areas so that refills do not disturb residents.
It is different rather than higher. In older cities, colonies feed on old buildings and buried timber, while Greater Noida plots often sit on recently farmed land with roots and crop waste in the soil. In both cases, a refillable barrier laid at the foundation covers the building from day one.
It depends on the plan. PipeGuard Basic carries a written SKUAS warranty of up to 3 years, PipeGuard Plus up to 5 years, and PipeGuard Max up to 10 years with an AMC. The warranty is issued by SKUAS, and rates and terms are confirmed after a free site inspection.

Aam sawal (Hinglish)

Plinth beam ke baad, mitti bharne aur PCC se pehle. Kaam shuru karte hi humein timeline bata dein.
Haan. Pipe pehle lag jaayega, aur chemical ki pehli filling PCC ke kareeb di ja sakti hai.
Haan, builder aur maintenance team ke saath. Refill common area ke junction box se hota hai.

Building in Greater Noida? Book a free site inspection

Our engineer visits, measures the plinth and shares an itemised quote. The best time is before the plinth beam or floor PCC.