Anti-Termite Reticulation System in Noida

Quick answer

SKUAS installs anti-termite reticulation in Noida for plotted houses, villas and group housing towers. TermiPore porous pipe is laid along the plinth and wall lines before the floor is cast, then charged with Envu Premise SC at the IS 6313 dose of 5 litres per m². Refills every 2 to 3 years go through junction boxes, with no drilling.

TermiPore porous pipesEnvu Premise SC termiticideDosage as per IS 6313Written SKUAS warrantyServing since 2012

Noida was planned in numbered sectors, and that shapes how termite work is done here. In older plotted sectors such as 15, 19, 26 and 30, original single-storey houses are being replaced with three and four-storey homes. The sectors along the Noida-Greater Noida Expressway are filling with group housing towers, villas and commercial plots allotted by the Noida Authority. Each kind of site reaches its plinth stage on a different timeline, and we plan around that.

Most of this land was farmland in the Yamuna and Hindon flood plain before it was developed, and subterranean termites were living in it long before the first column went up. Laying TermiPore pipe while the plinth is still open puts a refillable barrier into that soil. After the floor is finished, every refill is done from junction boxes in the setback, parking or landscaping strip, so nobody has to lift tiles.

Termite risk in Noida: what we plan for

Flood-plain alluvium between two rivers

Noida sits on soft alluvial soil laid down by the Yamuna and the Hindon. This soil holds moisture below the surface for long periods, which suits subterranean termites. Colonies spread easily through it and reach new foundations from neighbouring plots, green belts and the parks that almost every sector is planned around.

Group housing on deep basements

Expressway societies usually have one or two basement levels with towers above. Termites that reach the basement can travel upward through service shafts, expansion joints and cable trays. On these projects we plan the pipe along the retaining walls and the lowest slab level, and coordinate the layout with the waterproofing contractor before backfilling.

Rebuilds in older plotted sectors

When a house from the 1980s or 1990s in a plotted sector is demolished, old wooden frames, roots and debris often stay buried in the plot. Termites feeding on that material are already active when the new excavation is dug. A pipe line around the new plinth puts treated soil between those colonies and the new woodwork.

Humid monsoon months

From July to September the ground in Noida stays wet for weeks, and winged termites are often seen swarming after the first heavy rains. Because a reticulation system can be recharged on a schedule, the treated zone around the foundation does not depend on a single dose applied years earlier.

Reticulation pipe layout along boundary and internal walls with junction boxes, and a cross-section at the plinth
Typical layout we install in Noida: porous pipe along every wall line, refilled through junction boxes outside.

Pipe and chemical we use in Noida

TermiPore porous pipe cross-section showing micro-pores on all sides

The pipe we install

TermiPore porous pipe

Made in Vadodara, Gujarat, India from a thermoplastic elastomeric compound with a honeycomb micro-pore wall. Termiticide seeps out evenly through micro-pores on all sides, unlike hand-drilled PVC that leaks at a few holes. The manufacturer rates pipe life at 30 to 50 years (manufacturer estimate).

Sizes, specs and how to spot genuine pipe
Envu Premise SC termiticide 1 litre bottle

The chemical we charge it with

Envu Premise SC

Imidacloprid 30.5% SC from Envu (formerly Bayer Environmental Science). It is odourless and non-repellent: termites cannot detect it, carry it back to the nest and pass it on to the colony.

Why we use Premise SC

Reticulation plans in Noida

PipeGuard Basic

Boundary protection for compact homes

  • Coverage: External boundary (plinth perimeter) only
  • Pipe: TermiPore 17.5 mm (green stripe)
  • Refill points: Junction box every 25 to 30 m
  • Chemical: First charge with Envu Premise SC
  • Warranty: Up to 3 years written SKUAS warranty
  • Refill: Refill recommended every 2 years
  • Flow test before covering
  • Installation photos

Rate: shared after a free site inspection

Get my estimate

PipeGuard Max

Builders, societies and commercial sites

  • Coverage: Boundary, internal walls and under-floor grid
  • Pipe: TermiPore 19.5 mm premium (red stripe)
  • Refill points: Brass-nipple junction boxes every 20 m
  • Chemical: First charge with Envu Premise SC
  • Warranty: Up to 10 years written SKUAS warranty with AMC
  • Refill: Scheduled refills under AMC
  • Pressure and flow test log
  • As-built drawing for handover
  • Annual inspection report

Rate: shared after a free site inspection

Get my estimate

Every site is different. Soil, plinth size, wall layout and access change the final figure, so we confirm the exact rate after a free site inspection. Warranty is SKUAS's own written service warranty; the period depends on the plan and site conditions.

Free estimate in 30 seconds

Reticulation System Estimator

Get the pipe length, number of refill points, chemical quantity and the right plan for your building. Our engineer then shares the exact rate on WhatsApp or call.

Buildings we protect in Noida

Plotted houses in older sectors

Pipe along the boundary and every room wall of the rebuilt house, with junction boxes in the front setback.

Expressway group housing

Perimeter and basement wall lines for each tower, planned with the developer's site engineer and handed over with an as-built drawing.

Large villas and corner plots

Room-wise loops under ground-floor rooms that will carry wooden flooring, built-in wardrobes or a home library.

IT offices and units in Sector 62, 63 and Phase 2

Boundary and column-line pipe for office blocks, server rooms and stores that keep paper, cartons or wooden pallets.

How a Noida installation runs

Noida sites are handled from our New Delhi head office on Okhla Road, a short drive across the Kalindi Kunj bridge or the DND Flyway. For group housing projects we join the site engineer's coordination meeting before the basement or plinth is backfilled, so the pipe layout fits the waterproofing and plumbing plan.

  1. Free site visit. We measure the plinth and mark wall lines on your drawing.
  2. Pipe laying. TermiPore pipe on a levelled bed along every planned line, joined to junction boxes.
  3. Flow test. Water is pumped through each loop before the pipe is covered.
  4. First charge. Premise SC at the IS 6313 dose of 5 L per m² of floor area.
  5. Handover. Photos, port layout and your refill reminder schedule.

Chemical quantity per charge

Chemical quantity per charge (IS 6313 dose of 5 L per m² of floor area)
Floor areaDiluted emulsionPremise SC concentrate
500 sq ft≈ 230 litres≈ 490 ml
1,000 sq ft≈ 465 litres≈ 980 ml
1,500 sq ft≈ 695 litres≈ 1.5 litres
2,000 sq ft≈ 930 litres≈ 2.0 litres
3,000 sq ft≈ 1,395 litres≈ 2.9 litres
5,000 sq ft≈ 2,325 litres≈ 4.9 litres
10,000 sq ft≈ 4,645 litres≈ 9.8 litres

Areas we cover in and around Noida

Sector 15, Sector 15A, Sector 18, Sector 19, Sector 26, Sector 30, Sector 37, Sector 44, Sector 47, Sector 50, Sector 51, Sector 61, Sector 62, Sector 63, Sector 75, Sector 76, Sector 78, Sector 93, Sector 100, Sector 104, Sector 107, Sector 120, Sector 128, Sector 137, Sector 143, Sector 150, Sector 168, Noida Phase 2.

Frequently asked questions: reticulation in Noida

Usually the developer, because the pipe has to go in before the basement and ground floor are covered. If you are part of an early buyers' group or an RWA being formed, ask the developer which anti-termite method is planned. We work directly with developers' site teams on group housing projects.
Call us once excavation is done and foundation work starts. We lay the pipe after the plinth beam is complete and before the soil filling and floor PCC. An early visit lets us mark junction box positions so they do not clash with the ramp, gate or meter board.
Yes. On group housing towers the junction boxes are placed in common areas such as the basement, podium edge or landscaping strip. The facility team gives us access to those points, and the refill is completed without visiting any apartment.
For a finished house we lay pipe in a trench along the outside walls and fit junction boxes for future refills. Inside, where the floor cannot be opened, we drill small holes along the wall-floor joints, inject Premise SC and seal them. Rates are shared after a free inspection.
For most plotted houses, pipe laying and the flow test are finished in one working day. Large villas and tower footprints take longer, and we give you a timeline once the plinth has been measured.

Aam sawal (Hinglish)

Zyadatar builder, basement aur ground floor dhakne se pehle. Hum builder ki site team ke saath kaam karte hain.
Plinth beam ban jaaye, phir PCC se pehle hum pipe bichha dete hain. Foundation ke time ek baar site dikha dein.
Nahi. Junction box common area me hote hain, wahin se refill ho jaata hai.

Building in Noida? Book a free site inspection

Our engineer visits, measures the plinth and shares an itemised quote. The best time is before the plinth beam or floor PCC.